Detailed design report
The detailed design report is prepared by the lead consultant for the client at the end of the detailed design stage, when the design is detailed but has yet to be packaged.
The detailed design report might include:
- A design and access statement.
- Site layout plans.
- Functional layouts.
- Circulation and operational strategy.
- Floor plans, sections and elevations.
- 3d modelling.
- Details of wall enclosures.
- Details of doors and windows.
- Details of key specification items such as door handles, plumbing fixtures and so on.
- Reflected ceiling plan.
- Key technical designs.
- Co-ordination between architectural and engineering design.
- Phasing, demolition and decanting strategies.
- The use of materials and the potential for re-use, recycling and waste handling (see site waste management plan).
- Structural design criteria.
- Drainage.
- Sustainability.
- Cleaning and maintenance strategy.
- Site services analysis (existing gas, water, electrical, mechanical, etc. services).
- Building services design criteria.
- Services strategy.
- Health and safety strategy.
- Fire strategy.
- Status of approvals.
- Risk assessment.
- Cost plan.
- Programme and phasing.
- Procurement strategy.
The report should highlighting any instructions required from the client.
It should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).